middle.news

Asian Battery Metals Confirms High-Grade Massive Sulphides at Oval Project

8:47am on Monday 13th of January, 2025 AEDT Mining
Read Story

Asian Battery Metals Confirms High-Grade Massive Sulphides at Oval Project

8:47am on Monday 13th of January, 2025 AEDT
Key Points
  • Final assays confirm high-grade massive sulphide intercepts in drillholes OVD026 and OVD027
  • Notable intercepts include 6.1m @ 4.16% Cu and 3.51% Ni in OVD027 and 1.8m @ 3.21% Cu and 3.32% Ni in OVD026
  • Drilling supports continuity of mineralisation within the Oval gabbroic intrusion
  • Downhole electromagnetic (DHEM) surveys identify multiple untested conductive plates for future drilling
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Azzuro Resources (ASX:AZ9)
OPEN ARTICLE