middle.news

Greenwing Unveils 1.07Mt LCE Maiden Resource at San Jorge Lithium Project

7:03pm on Monday 2nd of June, 2025 AEST Mining
Read Story

Greenwing Unveils 1.07Mt LCE Maiden Resource at San Jorge Lithium Project

7:03pm on Monday 2nd of June, 2025 AEST
Key Points
  • Maiden Mineral Resource Estimate of 1.07 Mt LCE (0.67 Mt Indicated, 0.4 Mt Inferred)
  • Geophysical surveys (MT and TEM) reveal brine extends over 4 km west and 5 km north of salar
  • Lithium concentration increases with depth, reaching up to 248 mg/L in deepest drill holes
  • Phase 2 drilling planned with seven additional diamond holes targeting resource expansion
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about GW1
OPEN ARTICLE