middle.news
Greenwing Unveils 1.07Mt LCE Maiden Resource at San Jorge Lithium Project
7:03pm on Monday 2nd of June, 2025 AEST
•
Mining
Read Story
Greenwing Unveils 1.07Mt LCE Maiden Resource at San Jorge Lithium Project
7:03pm on Monday 2nd of June, 2025 AEST
Key Points
Maiden Mineral Resource Estimate of 1.07 Mt LCE (0.67 Mt Indicated, 0.4 Mt Inferred)
Geophysical surveys (MT and TEM) reveal brine extends over 4 km west and 5 km north of salar
Lithium concentration increases with depth, reaching up to 248 mg/L in deepest drill holes
Phase 2 drilling planned with seven additional diamond holes targeting resource expansion
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
GW1
OPEN ARTICLE