middle.news
Catalyst Metals Accelerates Gold Output with Plutonic East Revival
8:21am on Tuesday 21st of January, 2025 AEDT
•
Mining
Read Story
Catalyst Metals Accelerates Gold Output with Plutonic East Revival
8:21am on Tuesday 21st of January, 2025 AEDT
Key Points
Current production at 110koz annually from Plutonic and Henty operations
Plutonic East redevelopment underway with first ore expected this quarter
Grade control drilling reveals high-grade gold intercepts up to 234g/t
Group production forecast to reach 200koz within 12 to 18 months
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Catalyst Metals (ASX:CYL)
OPEN ARTICLE