middle.news

Catalyst Metals Accelerates Gold Output with Plutonic East Revival

7:03pm on Monday 2nd of June, 2025 AEST Mining
Read Story

Catalyst Metals Accelerates Gold Output with Plutonic East Revival

7:03pm on Monday 2nd of June, 2025 AEST
Key Points
  • Current production at 110koz annually from Plutonic and Henty operations
  • Plutonic East redevelopment underway with first ore expected this quarter
  • Grade control drilling reveals high-grade gold intercepts up to 234g/t
  • Group production forecast to reach 200koz within 12 to 18 months
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Catalyst Metals (ASX:CYL)
OPEN ARTICLE