middle.news

Delta Lithium Unveils High-Grade Lithium and Robust Metallurgy at Yinnetharra

7:03pm on Monday 2nd of June, 2025 AEST Mining
Read Story

Delta Lithium Unveils High-Grade Lithium and Robust Metallurgy at Yinnetharra

7:03pm on Monday 2nd of June, 2025 AEST
Key Points
  • Yinnetharra Lithium Project holds 25.7Mt @ 1% Li2O resource at Malinda Prospect
  • Recent drilling delivers high-grade lithium intercepts up to 2.16% Li2O over 22.6m
  • Feasibility-level metallurgical tests confirm high-grade spodumene concentrate with recoveries up to 81.8%
  • Whole of Ore Flotation flowsheet validated through pilot plant processing
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about DLI
OPEN ARTICLE