middle.news
Patagonia Lithium Unveils 3.8 Million Tonnes LCE Maiden Resource at Formentera
7:03pm on Monday 2nd of June, 2025 AEST
•
Mining
Read Story
Patagonia Lithium Unveils 3.8 Million Tonnes LCE Maiden Resource at Formentera
7:03pm on Monday 2nd of June, 2025 AEST
Key Points
Maiden JORC Inferred Mineral Resource Estimate of 3.8 million tonnes LCE
High porosity zones with 173,000 tonnes LCE supporting a 15-year mine life at 10,000 tpa
Upcoming drilling and geophysical surveys targeting resource upgrades
Use of Ekosolve™ Direct Lithium Extraction technology with over 92% lithium recovery
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Patagonia Lithium (ASX:PL3)
OPEN ARTICLE