middle.news
Godolphin Uncovers Up to 42.7m Sulphide Mineralisation at Lewis Ponds
9:20am on Thursday 30th of January, 2025 AEDT
•
Mining
Read Story
Godolphin Uncovers Up to 42.7m Sulphide Mineralisation at Lewis Ponds
9:20am on Thursday 30th of January, 2025 AEDT
Key Points
Four drill holes intersected extensive sulphide mineralisation including up to 42.7m thickness
Drilling targeted and confirmed zones within the existing JORC 2012 Inferred Mineral Resource
Assay results pending, expected by mid to late February 2025
Potential upgrade from Inferred to Indicated resource classification planned
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Godolphin Resources (ASX:GRL)
OPEN ARTICLE