middle.news

Aeris Resources Navigates Operational Hurdles with Strong Production and Cash Flow

10:03am on Friday 31st of January, 2025 AEDT Mining
Read Story

Aeris Resources Navigates Operational Hurdles with Strong Production and Cash Flow

10:03am on Friday 31st of January, 2025 AEDT
Key Points
  • Consistent group copper equivalent production of 10.2kt
  • Reduced All-In Sustaining Cost (AISC) to A$4.93/lb Cu eq
  • Operational challenges at Tritton addressed, maintaining annual guidance
  • Strong gold output at Cracow with 12.2koz produced, exceeding plan
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Aeris Resources (ASX:AIS)
OPEN ARTICLE