middle.news
Australian Mines Unveils Strong Rare Earth Results at Jequie Project
9:31am on Friday 14th of February, 2025 AEDT
•
Mining
Read Story
Australian Mines Unveils Strong Rare Earth Results at Jequie Project
9:31am on Friday 14th of February, 2025 AEDT
Key Points
72 shallow auger drill holes completed totaling 500.6m
Jequie South drill hole DAME-FT-14 returned 15m at 1720 ppm TREO
69% of Jequie South assays exceeded 400 ppm TREO
Distinct Cerium depletion suggests ionic clay adsorption mineralisation
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Australian Mines (ASX:AUZ)
OPEN ARTICLE