middle.news

Australian Mines Unveils Strong Rare Earth Results at Jequie Project

9:31am on Friday 14th of February, 2025 AEDT Mining
Read Story

Australian Mines Unveils Strong Rare Earth Results at Jequie Project

9:31am on Friday 14th of February, 2025 AEDT
Key Points
  • 72 shallow auger drill holes completed totaling 500.6m
  • Jequie South drill hole DAME-FT-14 returned 15m at 1720 ppm TREO
  • 69% of Jequie South assays exceeded 400 ppm TREO
  • Distinct Cerium depletion suggests ionic clay adsorption mineralisation
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Australian Mines (ASX:AUZ)
OPEN ARTICLE