Gateway’s Exploration Spend of AUD 323K Highlights Focus Amid Pending Assays

Gateway Mining Limited has completed comprehensive airborne magnetic and geochemical surveys at its Barrelmaker Gold Project, setting the stage for targeted drilling and further exploration in Western Australia’s Sandstone region.

  • Completion of high-resolution airborne magnetic survey covering 100% of Barrelmaker Project
  • Geochemical sampling over 22km Youno Fault corridor with assays pending
  • Field assessment and structural mapping of key gold mineralisation targets
  • Ongoing joint venture drilling at Edjudina Project with Latitude Resources
  • Cash reserves of AUD 4.22 million and exploration expenditure of AUD 323,000 for the quarter
An image related to Gateway Mining Limited
Image source middle. ©

Comprehensive Geophysical Surveys Complete

Gateway Mining Limited (ASX: GML) has reported significant progress in its exploration activities during the March 2025 quarter, highlighted by the completion of a high-quality airborne magnetic survey across the entire 488km2 Barrelmaker Gold Project in Western Australia’s Sandstone region. This survey, conducted by MagSpec Airborne Surveys and processed by Southern Geoscience Consultants, provides a detailed geophysical dataset with 50-metre line spacing, enhancing the resolution over previously low-quality regional data.

Complementing the magnetic survey, Gateway completed a systematic geochemical sampling program along the 22-kilometre Youno Fault corridor, a major structural feature within the project area. This corridor remains largely untested historically, and the pending assay results are eagerly anticipated as they could reveal new gold mineralisation zones.

Field Assessments and Structural Mapping Inform Next Steps

In addition to geophysical and geochemical work, Gateway undertook detailed field assessments including structural mapping and regolith characterisation of identified key targets. These efforts aim to better understand the controls on gold mineralisation and refine targeting ahead of drilling. The integration of these datasets is expected to underpin the design of future exploration programs, including drill testing.

The Barrelmaker Project, covering over 80 kilometres of prospective strike within the under-explored Gum Creek Greenstone Belt, represents one of the largest consolidated land holdings in the Sandstone region. Despite historical exploration, the project has not been fully tested with modern techniques until now, positioning Gateway to unlock its potential.

Joint Venture Drilling Advances at Edjudina

Meanwhile, Gateway’s joint venture with Latitude Resources (ASX: LAT) at the Edjudina Project in the Laverton region continues to advance. Latitude has commenced a 9,000-metre aircore drilling program targeting significant gold-in-soil anomalies, with results expected in the near term. This drilling follows up on previous exploration success and aims to extend known mineralisation zones.

Financial Position and Outlook

Gateway reported a solid cash position of AUD 4.22 million at quarter-end, with exploration expenditure of AUD 323,000 during the period. There were no mining production or development activities reported, consistent with the company’s focus on exploration and resource definition. Payments to related parties, including directors and consultants, were disclosed in line with ASX requirements.

Looking ahead, Gateway plans to integrate the new geophysical and geochemical data to generate refined drill targets, particularly along the Youno Fault corridor. The company’s methodical approach to building foundational datasets before drilling reflects a disciplined strategy to unlock value in its large-scale projects.

Bottom Line?

Gateway’s methodical groundwork at Barrelmaker sets a promising platform for upcoming drill campaigns and potential resource growth.

Questions in the middle?

  • When will the assay results from the Youno Fault geochemical sampling be released, and what might they reveal?
  • How will the new airborne magnetic data influence the prioritisation of drill targets at Barrelmaker?
  • What are the expected timelines and potential outcomes for the Edjudina joint venture drilling program?