middle.news
Brightstar Accelerates Sandstone Gold Project with 80,000m Drilling and 2026 PFS
5:30am on Monday 2nd of June, 2025 AEST
•
Mining
Read Story
Brightstar Accelerates Sandstone Gold Project with 80,000m Drilling and 2026 PFS
5:30am on Monday 2nd of June, 2025 AEST
Key Points
Fully funded +80,000m drilling program underway in 2025 at Sandstone
Pre-Feasibility Study (PFS) targeting completion in 1H 2026
Current Mineral Resource Estimate of 1.5Moz Au at 1.5g/t targeted for upgrade in 2H 2025
Conceptual processing plant capacity of 2.5–3.5Mtpa near Sandstone town
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
BTR
OPEN ARTICLE