middle.news

St Barbara Unveils 13-Year Simberi Expansion with 2.2Moz Gold and US$717M NPV

5:34am on Monday 2nd of June, 2025 AEST Mining
Read Story

St Barbara Unveils 13-Year Simberi Expansion with 2.2Moz Gold and US$717M NPV

5:34am on Monday 2nd of June, 2025 AEST
Key Points
  • 13-year Life of Mine Plan with 2.2 million ounces gold production
  • Annual gold production rising above 220,000 ounces from FY28
  • Initial capital expenditure estimated at US$235 million plus US$40-60 million pre-expansion capital
  • Post-tax NPV of US$717 million and IRR of 62% at US$2,500/oz gold price
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about St Barbara (ASX:SBM)
OPEN ARTICLE