middle.news

How Terra Metals’ New Concentrates Could Transform the Dante Project

5:07am on Monday 2nd of June, 2025 AEST Mining
Read Story

How Terra Metals’ New Concentrates Could Transform the Dante Project

5:07am on Monday 2nd of June, 2025 AEST
Key Points
  • Produced three high-grade concentrates with strong recoveries using low-cost processing
  • Extended mineralised strike at Dante Project by 1.2km to 4.2km total
  • Commenced maiden Mineral Resource Estimate and Phase 2 metallurgical optimisation
  • Secured 12-month exclusive option to acquire 618km² contiguous tenements adjacent to Dante
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about TM1
OPEN ARTICLE