middle.news

Zimplats Battles Production Slump and Rising Costs While Projects Progress

5:51am on Monday 2nd of June, 2025 AEST Mining
Read Story

Zimplats Battles Production Slump and Rising Costs While Projects Progress

5:51am on Monday 2nd of June, 2025 AEST
Key Points
  • Six lost-time injuries recorded, safety remediation underway
  • Mining volumes down 11% year-on-year and 4% quarter-on-quarter
  • 6E head grade marginally up 1% year-on-year but metal in final product down 16%
  • Operating cash costs rose 3% year-on-year due to power and mining resumption
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Zimplats Holdings (ASX:ZIM)
OPEN ARTICLE