middle.news

Alpha HPA Advances Stage 2 Build, Secures 60% LOI Coverage Amid Semiconductor Surge

4:48am on Monday 2nd of June, 2025 AEST Materials
Read Story

Alpha HPA Advances Stage 2 Build, Secures 60% LOI Coverage Amid Semiconductor Surge

4:48am on Monday 2nd of June, 2025 AEST
Key Points
  • 66kVA powerline installed and 30% engineering design completed for HPA First Project Stage 2
  • Letters of Intent secured for over 60% of Stage 2 production, mainly from semiconductor sector
  • Stage 1 production fully committed through June 2025 with expansion options under review
  • Alpha Sapphire advances sapphire wafer production and signs Heads of Agreement for Brisbane Phase B site
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Alpha Hpa (ASX:A4N)
OPEN ARTICLE