middle.news
Brightstar Targets 200koz Gold Output by 2029 with Sandstone and Hub Expansions
3:11am on Monday 2nd of June, 2025 AEST
•
Mining
Read Story
Brightstar Targets 200koz Gold Output by 2029 with Sandstone and Hub Expansions
3:11am on Monday 2nd of June, 2025 AEST
Key Points
Current production run rate of 20koz pa, aiming to double by mid-2025
Definitive Feasibility Studies for Laverton and Menzies due 1H CY25
Sandstone Pre-Feasibility Study targeted for 1H CY26 with first gold production by 2H CY28
Aggressive 130,000m drilling program planned in 2025 to upgrade and expand resources
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Brightstar Resources (ASX:BTR)
OPEN ARTICLE