middle.news

How Prospect Resources’ Flotation Breakthrough Could Slash Mumbezhi Costs

2:16am on Monday 2nd of June, 2025 AEST Mining
Read Story

How Prospect Resources’ Flotation Breakthrough Could Slash Mumbezhi Costs

2:16am on Monday 2nd of June, 2025 AEST
Key Points
  • High-grade copper concentrates with up to 96.2% recovery from Nyungu Central sulphide samples
  • Primary grind size coarsened from 150 µm to 250 µm with minimal copper recovery loss
  • Metallurgical testwork confirms suitability of simple flotation flowsheet
  • Ongoing testwork on transitional and Kabikupa deposit materials due late Q2 2025
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Prospect Resources (ASX:PSC)
OPEN ARTICLE