middle.news

Brightstar Targets 200koz Gold Output by 2029 with Key DFS Milestones Ahead

2:00am on Monday 2nd of June, 2025 AEST Mining
Read Story

Brightstar Targets 200koz Gold Output by 2029 with Key DFS Milestones Ahead

2:00am on Monday 2nd of June, 2025 AEST
Key Points
  • Current production run rate of ~20koz pa to double to ~40koz pa by mid-2025
  • Definitive Feasibility Studies (DFS) for Laverton and Menzies hubs due 1H CY25
  • Pre-Feasibility Study (PFS) for Sandstone project targeted for 1H CY26
  • 3.0Moz Mineral Resource base with aggressive 130,000m drilling program in 2025
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Brightstar Resources (ASX:BTR)
OPEN ARTICLE