middle.news
Brightstar Targets 200koz Gold Output by 2029 with Key DFS Milestones Ahead
2:00am on Monday 2nd of June, 2025 AEST
•
Mining
Read Story
Brightstar Targets 200koz Gold Output by 2029 with Key DFS Milestones Ahead
2:00am on Monday 2nd of June, 2025 AEST
Key Points
Current production run rate of ~20koz pa to double to ~40koz pa by mid-2025
Definitive Feasibility Studies (DFS) for Laverton and Menzies hubs due 1H CY25
Pre-Feasibility Study (PFS) for Sandstone project targeted for 1H CY26
3.0Moz Mineral Resource base with aggressive 130,000m drilling program in 2025
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Brightstar Resources (ASX:BTR)
OPEN ARTICLE