How Duketon Mining Is Advancing Gold Exploration at Killarney and Barlee
Duketon Mining has advanced exploration activities at its Killarney and Barlee gold projects, with new sampling and drilling programs underway pending approvals.
- Preliminary site visit and rock sampling completed at Killarney
- Auger regolith sampling and RC drilling planned at Killarney
- Soil orientation survey finished at Barlee with samples sent for analysis
- Infill soil sampling and access route planning underway at Barlee
- Awaiting regulatory approval for RC drilling at Killarney
Exploration Momentum Builds at Killarney
Duketon Mining Limited has reported steady progress in its gold exploration efforts at the Killarney Project. Following the recent execution of an option agreement, the company completed a preliminary site visit that included collecting additional rock samples and conducting detailed geological mapping. Notably, the team engaged with a previous prospector who historically extracted around 20 kilograms of gold from an open pit on the site, providing valuable insights into the project's mineralisation and production history.
Looking ahead, Duketon plans to commence auger regolith sampling in late May 2025, a geochemical technique aimed at better understanding the near-surface mineral content. Concurrently, the company has submitted a Program of Works for reverse circulation (RC) drilling and engaged a contractor, though it awaits regulatory approval before drilling can begin. These steps indicate a methodical approach to advancing the project’s exploration potential.
Barlee Project Advances with Soil Surveys and Planning
At the Barlee Project, Duketon has completed a soil orientation survey targeting historic gold-in-soil anomalies. This survey was designed to validate previous sampling results and refine the methodology for future geochemical work. Samples collected during this phase are currently undergoing laboratory analysis, with infill soil sampling planned to provide a more detailed understanding of the gold distribution.
In addition to sampling, the company has engaged with the local station owner to establish the most practical access routes for upcoming exploration activities, including further geochemical sampling, aircore drilling, and RC drilling. This collaboration underscores Duketon’s commitment to responsible and efficient exploration practices.
Next Steps and Future Outlook
Duketon’s immediate plans focus on initiating auger drilling and RC drilling at Killarney, alongside infill soil sampling at Barlee. Looking further ahead, the company anticipates follow-up RC drilling at Killarney, heritage surveys at Barlee, and additional aircore and RC drilling programs. These sequential steps reflect a comprehensive exploration strategy aimed at progressively de-risking and defining gold resources.
While assay results from recent sampling are pending and regulatory approvals remain outstanding, the update signals a clear trajectory of exploration activity. Investors and analysts will be watching closely for the outcomes of these programs, which could materially influence Duketon’s resource base and valuation.
Bottom Line?
Duketon’s exploration push at Killarney and Barlee sets the stage for potential resource growth, with key assay results and drilling approvals on the horizon.
Questions in the middle?
- When will assay results from recent rock and soil samples be released?
- What is the expected timeline for regulatory approval of the RC drilling program at Killarney?
- How might the engagement with local stakeholders impact the pace and scope of exploration at Barlee?