middle.news
Peak Minerals Unveils Massive 28km Heavy Mineral Zone at Minta Project
2:02am on Monday 2nd of June, 2025 AEST
•
Mining
Read Story
Peak Minerals Unveils Massive 28km Heavy Mineral Zone at Minta Project
2:02am on Monday 2nd of June, 2025 AEST
Key Points
29 drill holes confirm heavy mineralisation over 28km strike length
All holes intersected heavy minerals from surface with average depth of 3.9m
Significant rutile content averaging 63.2% in discovery hole
Oversize rutile nuggets (+1mm) observed but assays pending
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
PUA
OPEN ARTICLE