middle.news

Peak Minerals Unveils Massive 28km Heavy Mineral Zone at Minta Project

2:02am on Monday 2nd of June, 2025 AEST Mining
Read Story

Peak Minerals Unveils Massive 28km Heavy Mineral Zone at Minta Project

2:02am on Monday 2nd of June, 2025 AEST
Key Points
  • 29 drill holes confirm heavy mineralisation over 28km strike length
  • All holes intersected heavy minerals from surface with average depth of 3.9m
  • Significant rutile content averaging 63.2% in discovery hole
  • Oversize rutile nuggets (+1mm) observed but assays pending
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about PUA
OPEN ARTICLE