middle.news
How Brazilian Critical Minerals Cracked Hydraulic Permeability in 72 Hours at Ema
1:40am on Monday 2nd of June, 2025 AEST
•
Mining
Read Story
How Brazilian Critical Minerals Cracked Hydraulic Permeability in 72 Hours at Ema
1:40am on Monday 2nd of June, 2025 AEST
Key Points
Solution detected in all extraction holes within 72 hours
Hydraulic connectivity validated in mineralised zone
High rare earth recoveries expected from soft, quartz-rich clays
Ongoing injection scenarios and rehabilitation tests planned
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Brazilian Critical Minerals (ASX:BCM)
OPEN ARTICLE