middle.news

How Brazilian Critical Minerals Cracked Hydraulic Permeability in 72 Hours at Ema

1:40am on Monday 2nd of June, 2025 AEST Mining
Read Story

How Brazilian Critical Minerals Cracked Hydraulic Permeability in 72 Hours at Ema

1:40am on Monday 2nd of June, 2025 AEST
Key Points
  • Solution detected in all extraction holes within 72 hours
  • Hydraulic connectivity validated in mineralised zone
  • High rare earth recoveries expected from soft, quartz-rich clays
  • Ongoing injection scenarios and rehabilitation tests planned
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Brazilian Critical Minerals (ASX:BCM)
OPEN ARTICLE