middle.news

Brookside Energy Wraps Up Bruins Well Stimulation, Eyes Q2 Sales

1:39am on Monday 2nd of June, 2025 AEST Energy
Read Story

Brookside Energy Wraps Up Bruins Well Stimulation, Eyes Q2 Sales

1:39am on Monday 2nd of June, 2025 AEST
Key Points
  • Bruins Well stimulation completed safely, on time, within budget
  • All 42 fracture stimulation stages executed as designed
  • Production tubing installed, composite plugs drilled out
  • Flow-back and testing preparations underway
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Brookside Energy (ASX:BRK)
OPEN ARTICLE