middle.news

How Metal Powder Works Doubled Output Without Extra Capital

11:46pm on Monday 2nd of June, 2025 AEST Manufacturing
Read Story

How Metal Powder Works Doubled Output Without Extra Capital

11:46pm on Monday 2nd of June, 2025 AEST
Key Points
  • Production capacity doubled via process optimization
  • Material utilization improvements reduce cycle time by 40%
  • Capacity now exceeds 100 metric tons of key copper alloys
  • Focus on US Defence Industrial Base supply
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about METAL POWDER WORKS (ASX:MPW)
OPEN ARTICLE