middle.news

TechGen Wraps Up 6,355m Aircore Drilling at El Donna, Eyes Gold Assay Results

9:18am on Tuesday 3rd of June, 2025 AEST Mining
Read Story

TechGen Wraps Up 6,355m Aircore Drilling at El Donna, Eyes Gold Assay Results

9:18am on Tuesday 3rd of June, 2025 AEST
Key Points
  • 85 aircore drill holes completed totaling 6,355 meters
  • Over 2,130 composite samples submitted for gold analysis
  • Four new gold targets tested based on soil geochemistry and structural faults
  • Results anticipated in late June 2025
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about TG1
OPEN ARTICLE