middle.news
Beetaloo Energy Launches Hydraulic Stimulation on Basin’s Longest Horizontal Well
10:02am on Tuesday 17th of June, 2025 AEST
•
Energy
Read Story
Beetaloo Energy Launches Hydraulic Stimulation on Basin’s Longest Horizontal Well
10:02am on Tuesday 17th of June, 2025 AEST
Key Points
Hydraulic stimulation commenced on Carpentaria-5H, the longest horizontal well in Beetaloo Basin
Over 60 stimulation stages planned across a 3,310-metre horizontal section in Velkerri B Shale
Advanced stimulation design with increased pump rates and proppant intensity by Halliburton
30-day production test (IP30) results expected in late Q3 2025
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
EEG
OPEN ARTICLE