middle.news

How Kingston Resources Revived Gold Concentrate Production at Mineral Hill

9:21am on Monday 23rd of June, 2025 AEST Mining
Read Story

How Kingston Resources Revived Gold Concentrate Production at Mineral Hill

9:21am on Monday 23rd of June, 2025 AEST
Key Points
  • Gold concentrate production resumed after nearly a decade
  • Low-cost $14 million refurbishment of flotation circuit completed
  • Full processing capability restored for gold doré and base metals concentrates
  • Open pit mining to continue until mid-2026 before shift to underground mining
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Kingston Resources (ASX:KSN)
OPEN ARTICLE