middle.news

Leeuwin Metals Advances Marda Gold Project with New Drilling Phase Set

9:55am on Monday 23rd of June, 2025 AEST Mining
Read Story

Leeuwin Metals Advances Marda Gold Project with New Drilling Phase Set

9:55am on Monday 23rd of June, 2025 AEST
Key Points
  • Phase Two RC drilling (~3,000m) completed at Marda Central targeting Python and Golden Orb pits
  • Assay results from Phase Two expected within 3-6 weeks
  • Phase Three drilling planned for July at high-grade Evanston target
  • Ongoing 3D geological modelling to refine future drill targets
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Leeuwin Metals (ASX:LM1)
OPEN ARTICLE