middle.news
Kali Metals Extends Marble Bar Gold Strike to 2km, Eyes Maiden Drilling
9:17am on Wednesday 25th of June, 2025 AEST
•
Mining
Read Story
Kali Metals Extends Marble Bar Gold Strike to 2km, Eyes Maiden Drilling
9:17am on Wednesday 25th of June, 2025 AEST
Key Points
Gold mineralisation strike length extended to 2km at Marble Bar Project
600m extension into newly acquired Peggy tenement with high-grade rock chips
Rock chip samples up to 19.1 g/t gold, averaging 2.5 g/t Au at Tiger and Sherman prospects
New target zone identified between Tiger and Sherman prospects via UAV magnetic survey
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Kali Metals (ASX:KM1)
OPEN ARTICLE