middle.news

How McLaren Minerals’ Slimes Strategy Cuts Project Risk and Simplifies Design

8:34am on Wednesday 9th of July, 2025 AEST Mining
Read Story

How McLaren Minerals’ Slimes Strategy Cuts Project Risk and Simplifies Design

8:34am on Wednesday 9th of July, 2025 AEST
Key Points
  • Metallurgical test work confirms effective thickening and dewatering of slimes
  • Gypsum identified as optimal water conditioner for settling and clarification
  • Co-disposal of 100% slimes with coarse tails validated
  • Test results support simplified, lower-risk plant design
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about McLaren Minerals (ASX:MML)
OPEN ARTICLE