middle.news

Asra Minerals Targets High-Grade Gold Near Sapphire Deposit at Leonora South

8:27am on Monday 14th of July, 2025 AEST Mining
Read Story

Asra Minerals Targets High-Grade Gold Near Sapphire Deposit at Leonora South

8:27am on Monday 14th of July, 2025 AEST
Key Points
  • 3,000m reverse-circulation drilling planned at Challenge and Eclipse prospects
  • Targets located within 500m of existing 21,600oz JORC resource at Sapphire
  • Program aims to validate historic high-grade gold intersections
  • Drilling to commence mid-July with assays anticipated by September
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about ASR
OPEN ARTICLE