middle.news
How Cyclone Metals Plans 100% Renewable Power for Iron Bear’s Future
8:24am on Thursday 24th of July, 2025 AEST
•
Mining
Read Story
How Cyclone Metals Plans 100% Renewable Power for Iron Bear’s Future
8:24am on Thursday 24th of July, 2025 AEST
Key Points
Completion of Hatch-led power study endorsing 100% renewable energy supply
Phase 4 metallurgical test work yields high-grade iron concentrates and pellets
Engineering studies on rail and slurry pipeline advancing on schedule
Financial position bolstered by A$1.2m reimbursement from Vale and A$5.2m cash in Canadian subsidiary
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Cyclone Metals (ASX:CLE)
OPEN ARTICLE