middle.news

Ora Banda Unveils 1,000m+ Strike at Little Gem Gold Prospect

8:27am on Wednesday 30th of July, 2025 AEST Mining
Read Story

Ora Banda Unveils 1,000m+ Strike at Little Gem Gold Prospect

8:27am on Wednesday 30th of July, 2025 AEST
Key Points
  • Phase 2 drilling confirms multi-lode system with high-grade gold
  • Notable intercept – 8.8m at 6.3g/t gold at 320m depth
  • Strike length of Diamond Lode extends over 1,000 metres and remains open at depth
  • Four lodes modeled, Diamond, Ruby, Sapphire, Tanzanite
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Ora Banda Mining (ASX:OBM)
OPEN ARTICLE