middle.news

How Emperor Energy’s Judith Gas Field Upgrade Sets Stage for 2026 Drilling

12:22am on Sunday 21st of December, 2025 AEDT Energy
Read Story

How Emperor Energy’s Judith Gas Field Upgrade Sets Stage for 2026 Drilling

12:22am on Sunday 21st of December, 2025 AEDT
Key Points
  • GaffneyCline audit confirms 166 Bcf 2C Contingent and 1.86 Tcf P50 Prospective Resources
  • Successful $3.7 million placement supports Judith-2 well drilling plans
  • Judith-2 well positioned near existing Gippsland Basin infrastructure
  • Environmental Plan for Judith-2 approved for public consultation by NOPSEMA
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Emperor Energy (ASX:EMP)
OPEN ARTICLE