middle.news
How Emperor Energy’s Judith Gas Field Upgrade Sets Stage for 2026 Drilling
12:22am on Sunday 21st of December, 2025 AEDT
•
Energy
Read Story
How Emperor Energy’s Judith Gas Field Upgrade Sets Stage for 2026 Drilling
12:22am on Sunday 21st of December, 2025 AEDT
Key Points
GaffneyCline audit confirms 166 Bcf 2C Contingent and 1.86 Tcf P50 Prospective Resources
Successful $3.7 million placement supports Judith-2 well drilling plans
Judith-2 well positioned near existing Gippsland Basin infrastructure
Environmental Plan for Judith-2 approved for public consultation by NOPSEMA
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Emperor Energy (ASX:EMP)
OPEN ARTICLE