middle.news
How Polymetals’ Endeavor Mine Achieved Operating Cost Break-Even in One Month
8:57am on Monday 4th of August, 2025 AEST
•
Mining
Read Story
How Polymetals’ Endeavor Mine Achieved Operating Cost Break-Even in One Month
8:57am on Monday 4th of August, 2025 AEST
Key Points
Endeavor mine meets operating costs in first full production month
July production of 5,398 dry metric tonnes of silver-lead and zinc concentrates
Second concentrate prepayment of A$11.6 million secured
Mining of high-grade Upper North Lode silver ore to start in August
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Polymetals Resources (ASX:POL)
OPEN ARTICLE