middle.news

How New Tailings Presses Are Powering Alara’s Copper-Gold Surge

8:42am on Thursday 7th of August, 2025 AEST Mining
Read Story

How New Tailings Presses Are Powering Alara’s Copper-Gold Surge

8:42am on Thursday 7th of August, 2025 AEST
Key Points
  • Commissioning of two new interim tailings filter presses completed
  • Plant operational efficiency expected to rise from 62-65% to 85-90%
  • Monthly copper-gold concentrate production projected to increase to 3000-3200 dry metric tonnes
  • Reduction in unplanned stoppages and improved throughput
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Alara Resources (ASX:AUQ)
OPEN ARTICLE