middle.news

How 5E Advanced Materials Plans to Unlock $725M Value at Fort Cady Boron Project

8:53am on Friday 8th of August, 2025 AEST Mining
Read Story

How 5E Advanced Materials Plans to Unlock $725M Value at Fort Cady Boron Project

8:53am on Friday 8th of August, 2025 AEST
Key Points
  • 39.5-year mine life with 5.4 million tons boric acid reserves
  • Pre-tax NPV7 of US$724.8 million and 19.2% IRR
  • Phase 1 capital cost estimated at US$435 million including cogeneration power
  • In-situ leaching mining method with minimal surface disturbance
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about 5EA
OPEN ARTICLE