middle.news
How 5E Advanced Materials Plans to Unlock $725M Value at Fort Cady Boron Project
8:53am on Friday 8th of August, 2025 AEST
•
Mining
Read Story
How 5E Advanced Materials Plans to Unlock $725M Value at Fort Cady Boron Project
8:53am on Friday 8th of August, 2025 AEST
Key Points
39.5-year mine life with 5.4 million tons boric acid reserves
Pre-tax NPV7 of US$724.8 million and 19.2% IRR
Phase 1 capital cost estimated at US$435 million including cogeneration power
In-situ leaching mining method with minimal surface disturbance
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
5EA
OPEN ARTICLE