middle.news
Terra Metals Unveils Massive 148Mt Polymetallic Resource at Dante Project
9:18am on Monday 11th of August, 2025 AEST
•
Mining
Read Story
Terra Metals Unveils Massive 148Mt Polymetallic Resource at Dante Project
9:18am on Monday 11th of August, 2025 AEST
Key Points
Maiden Mineral Resource Estimate of 148Mt at 14.8% TiO2 and 0.54% V2O5
High-grade Indicated Resource of 38Mt with elevated copper and PGE content
Independent MRE by Pivot Mining Consultants with expert Ken Lomberg
Metallurgical testwork confirms excellent recoveries for key metals
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Terra Metals (ASX:TM1)
OPEN ARTICLE