middle.news
How Kinetiko’s Optimised Drilling Delivered 370 Mscfd Gas Flow at Brakfontein
9:40am on Monday 18th of August, 2025 AEST
•
Energy
Read Story
How Kinetiko’s Optimised Drilling Delivered 370 Mscfd Gas Flow at Brakfontein
9:40am on Monday 18th of August, 2025 AEST
Key Points
Optimised drilling procedures deliver strong initial gas flow
Peak gas flow rate of 370 Mscfd achieved during choke test
144m net pay zone confirmed via geophysical logging
Extended flow testing underway to stabilise production rates
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Kinetiko Energy (ASX:KKO)
OPEN ARTICLE