middle.news

How Kinetiko’s Optimised Drilling Delivered 370 Mscfd Gas Flow at Brakfontein

9:40am on Monday 18th of August, 2025 AEST Energy
Read Story

How Kinetiko’s Optimised Drilling Delivered 370 Mscfd Gas Flow at Brakfontein

9:40am on Monday 18th of August, 2025 AEST
Key Points
  • Optimised drilling procedures deliver strong initial gas flow
  • Peak gas flow rate of 370 Mscfd achieved during choke test
  • 144m net pay zone confirmed via geophysical logging
  • Extended flow testing underway to stabilise production rates
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Kinetiko Energy (ASX:KKO)
OPEN ARTICLE