middle.news

Global Uranium Unveils Strong Start at Pine Ridge Uranium Project

8:51am on Tuesday 19th of August, 2025 AEST Mining
Read Story

Global Uranium Unveils Strong Start at Pine Ridge Uranium Project

8:51am on Tuesday 19th of August, 2025 AEST
Key Points
  • First 17 drill holes confirm roll-front uranium mineralisation
  • Notable intercepts include 2.0m at 0.092% U3O8 and 1.2m at 0.132% U3O8
  • Drilling ongoing with 125 holes planned through November 2025
  • Land package expanded by 647 hectares (1,600 acres)
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Global Uranium and Enrichment (ASX:GUE)
OPEN ARTICLE