middle.news

Connected Minerals Launches Phase 2 Drilling After Strong Uranium Hits at Etango NE

8:23pm on Friday 29th of August, 2025 AEST Mining
Read Story

Connected Minerals Launches Phase 2 Drilling After Strong Uranium Hits at Etango NE

8:23pm on Friday 29th of August, 2025 AEST
Key Points
  • Phase 2 drilling commenced targeting Ondapanda Prospect with ~18 holes for 2,800m
  • Phase 1 delivered economic uranium grades in 14 of 15 holes
  • Notable uranium grades include up to 814 ppm eU3O8 over 1m
  • Mineralisation remains open at depth and along strike
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Connected Minerals (ASX:CML)
OPEN ARTICLE