middle.news

How Did Karoon Boost Baúna Reserves by 35% and Extend Field Life to 2039?

12:52am on Saturday 30th of August, 2025 AEST Energy
Read Story

How Did Karoon Boost Baúna Reserves by 35% and Extend Field Life to 2039?

12:52am on Saturday 30th of August, 2025 AEST
Key Points
  • 35% increase in Baúna Project 2P Reserves as of June 2025
  • Economic field life extended to 2039, aligned with Production Concession expiry
  • Significant capital expenditure planned for FPSO revitalisation and life extension
  • 2P recoverable volumes up 120% since Karoon’s 2020 acquisition
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Karoon Energy (ASX:KAR)
OPEN ARTICLE