middle.news
Black Canyon Extends Manganese Mineralisation 3km at Wandanya
8:30am on Monday 1st of September, 2025 AEST
•
Mining
Read Story
Black Canyon Extends Manganese Mineralisation 3km at Wandanya
8:30am on Monday 1st of September, 2025 AEST
Key Points
Phase 3 reverse circulation drilling completed with 148 holes for 3,831m
Manganese mineralisation confirmed along 3km strike with widths up to 720m
Iron mineralisation mapped over 3km north of drilling area
Assay results expected between October and November 2025
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Black Canyon (ASX:BCA)
OPEN ARTICLE