middle.news

Black Canyon Extends Manganese Mineralisation 3km at Wandanya

8:30am on Monday 1st of September, 2025 AEST Mining
Read Story

Black Canyon Extends Manganese Mineralisation 3km at Wandanya

8:30am on Monday 1st of September, 2025 AEST
Key Points
  • Phase 3 reverse circulation drilling completed with 148 holes for 3,831m
  • Manganese mineralisation confirmed along 3km strike with widths up to 720m
  • Iron mineralisation mapped over 3km north of drilling area
  • Assay results expected between October and November 2025
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Black Canyon (ASX:BCA)
OPEN ARTICLE