middle.news

Vintage Energy Boosts Cooper Basin Output by Tackling Scale Build-Up

11:21am on Monday 1st of September, 2025 AEST Energy
Read Story

Vintage Energy Boosts Cooper Basin Output by Tackling Scale Build-Up

11:21am on Monday 1st of September, 2025 AEST
Key Points
  • Phase 1 confirms widespread scale accumulation impacting production
  • Acid treatment effectively removes scale, improving gas flow
  • Combined raw gas production increased from 2.5 to 2.9 MMscf/d
  • Phase 2 planned to address remaining scale issues and enhance production
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Vintage Energy (ASX:VEN)
OPEN ARTICLE