middle.news
Mt Malcolm Mines Confirms Continuous Shallow Gold Mineralisation at Malcolm Project
9:13am on Thursday 4th of September, 2025 AEST
•
Mining
Read Story
Mt Malcolm Mines Confirms Continuous Shallow Gold Mineralisation at Malcolm Project
9:13am on Thursday 4th of September, 2025 AEST
Key Points
Shallow gold mineralisation confirmed over 700m strike length at Dumbarton
High-grade gold intercepts including 8m @ 1.20 g/t Au from surface at Sunday Underground
Follow-up drilling planned to test extensions and infill gaps at South Picnic
Results support potential for near-term resource growth and open-pit mining
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Mt Malcolm Mines (ASX:M2M)
OPEN ARTICLE