middle.news
How Will Barton Gold Turn 313koz at Challenger into Production by 2026?
9:03am on Monday 8th of September, 2025 AEST
•
Mining
Read Story
How Will Barton Gold Turn 313koz at Challenger into Production by 2026?
9:03am on Monday 8th of September, 2025 AEST
Key Points
Updated Challenger resource estimate at 313koz gold
Central Gawler Mill reinstatement cost preliminarily estimated at A$26 million
Two-phase development – tailings reprocessing followed by fresh ore mining
Feasibility studies underway targeting end-2026 operations
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Barton Gold Holdings (ASX:BGD)
OPEN ARTICLE