middle.news

How Will Barton Gold Turn 313koz at Challenger into Production by 2026?

9:03am on Monday 8th of September, 2025 AEST Mining
Read Story

How Will Barton Gold Turn 313koz at Challenger into Production by 2026?

9:03am on Monday 8th of September, 2025 AEST
Key Points
  • Updated Challenger resource estimate at 313koz gold
  • Central Gawler Mill reinstatement cost preliminarily estimated at A$26 million
  • Two-phase development – tailings reprocessing followed by fresh ore mining
  • Feasibility studies underway targeting end-2026 operations
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Barton Gold Holdings (ASX:BGD)
OPEN ARTICLE