middle.news

Beetaloo Energy Prepares for Key Gas Flow Test at Carpentaria-5H Well

9:14am on Monday 8th of September, 2025 AEST Energy
Read Story

Beetaloo Energy Prepares for Key Gas Flow Test at Carpentaria-5H Well

9:14am on Monday 8th of September, 2025 AEST
Key Points
  • Carpentaria-5H well hydraulically stimulated with 67 stages over nearly 3,000 metres
  • Conservative flowback strategy prioritizes water removal to preserve fracture network
  • Substantial associated gas flows observed during clean-up phase
  • Well currently shut in for soaking before IP30 flow test
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Beetaloo Energy Australia (ASX:BTL)
OPEN ARTICLE