middle.news
Beetaloo Energy Prepares for Key Gas Flow Test at Carpentaria-5H Well
9:14am on Monday 8th of September, 2025 AEST
•
Energy
Read Story
Beetaloo Energy Prepares for Key Gas Flow Test at Carpentaria-5H Well
9:14am on Monday 8th of September, 2025 AEST
Key Points
Carpentaria-5H well hydraulically stimulated with 67 stages over nearly 3,000 metres
Conservative flowback strategy prioritizes water removal to preserve fracture network
Substantial associated gas flows observed during clean-up phase
Well currently shut in for soaking before IP30 flow test
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Beetaloo Energy Australia (ASX:BTL)
OPEN ARTICLE