middle.news

How Is Finder Energy Accelerating KTJ Project Toward 2026 FID?

8:33am on Monday 8th of September, 2025 AEST Energy
Read Story

How Is Finder Energy Accelerating KTJ Project Toward 2026 FID?

8:33am on Monday 8th of September, 2025 AEST
Key Points
  • Accelerated Front End Engineering and Design (FEED) with Schlumberger underway
  • Advanced FPSO selection and rigorous due diligence in progress
  • Detailed subsurface reservoir modeling and drilling unit evaluations ongoing
  • Environmental impact studies initiated to meet regulatory requirements
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about FDR
OPEN ARTICLE