middle.news
Galileo Mining Uncovers 10km PGE Anomaly at Norseman, Plans Follow-Up Drilling
8:39am on Monday 8th of September, 2025 AEST
•
Mining
Read Story
Galileo Mining Uncovers 10km PGE Anomaly at Norseman, Plans Follow-Up Drilling
8:39am on Monday 8th of September, 2025 AEST
Key Points
Multiple significant palladium-platinum-gold intersections at Mission Sill
10km continuous PGE anomalism along Eastern Contact Zone
Peak assays include 4m at 4.78 g/t 3E and 4m at 3.46 g/t gold
Follow-up RC drilling scheduled for late October targeting Mission Sill and Callisto Deeps
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Galileo Mining (ASX:GAL)
OPEN ARTICLE