middle.news

Future Battery Minerals Uncovers Expansive Gold Shear Zone at Miriam Project

8:34am on Monday 15th of September, 2025 AEST Mining
Read Story

Future Battery Minerals Uncovers Expansive Gold Shear Zone at Miriam Project

8:34am on Monday 15th of September, 2025 AEST
Key Points
  • Strong gold anomalism identified in regolith at Canyon prospect
  • Miriam Shear zone extends 6.2 km and remains open along strike and at depth
  • Phase 2 drilling program expanded to over 3,000m targeting high-grade extensions
  • Key intercepts include 20m @ 0.55 g/t Au and 8m @ 0.78 g/t Au
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about FBM
OPEN ARTICLE