middle.news
Future Battery Minerals Uncovers Expansive Gold Shear Zone at Miriam Project
8:34am on Monday 15th of September, 2025 AEST
•
Mining
Read Story
Future Battery Minerals Uncovers Expansive Gold Shear Zone at Miriam Project
8:34am on Monday 15th of September, 2025 AEST
Key Points
Strong gold anomalism identified in regolith at Canyon prospect
Miriam Shear zone extends 6.2 km and remains open along strike and at depth
Phase 2 drilling program expanded to over 3,000m targeting high-grade extensions
Key intercepts include 20m @ 0.55 g/t Au and 8m @ 0.78 g/t Au
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
FBM
OPEN ARTICLE