middle.news

How Core Energy’s Maiden Drilling Validates Uranium Potential at Cummins

8:48am on Tuesday 16th of September, 2025 AEST Mining
Read Story

How Core Energy’s Maiden Drilling Validates Uranium Potential at Cummins

8:48am on Tuesday 16th of September, 2025 AEST
Key Points
  • 27 aircore drill holes completed for 2,775 metres at Cummins Uranium Project
  • Significant uranium intercepts exceeding 100ppm U3O8 identified
  • Classic roll-front uranium mineralisation confirmed across multiple stratigraphic horizons
  • Basement-hosted mineralisation with argillic alteration observed
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Core Energy Minerals (ASX:CR3)
OPEN ARTICLE