middle.news

Kinetiko Energy Surpasses Gas Flow Expectations at Brakfontein Well

9:38am on Thursday 25th of September, 2025 AEST Energy
Read Story

Kinetiko Energy Surpasses Gas Flow Expectations at Brakfontein Well

9:38am on Thursday 25th of September, 2025 AEST
Key Points
  • Production test well 271-KA03PT10 achieves sustained 92 Mscfd gas flow over 16 days
  • Methane content recorded at an exceptionally high 99%
  • Flow rate significantly exceeds independent reserve estimates requiring 50 Mscfd for viability
  • Testing underway at second well 271-KA03PT06 with peak flow of 1,600 Mscfd recorded
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Kinetiko Energy (ASX:KKO)
OPEN ARTICLE